Vehicle Impound Info
If your vehicle has been impounded, it is located at York Towing in Danville. To obtain your vehicle, you will need to obtain a vehicle release from our administration office BEFORE going to the tow yard, and BEFORE you will be able to retrieve your vehicle.
Vehicle releases are done at our Administration Office located at:
49 North Wayne Street
Danville, IN 46122
Monday - Friday
8:00 AM - 12 PM | 1:00 PM - 3:30 PM
(Closed on Holiday's)
To obtain a vehicle release, you will need to have two valid drivers, and the vehicle owner needs to be present with proof of ownership. If the vehicle was towed for registration or insurance issues, proof of valid registration or insurance will need to be provided. After this information has been checked, your vehicle will be released, and you will be provided with directions to the York Towing Impound Lot. York Towing will require payment before your vehicle is released.
VEHICLES CAN ONLY BE RELEASED TO THE REGISTERED OWNER!
If you have any questions, please contact our administration office at 317-745-4180
North Water Treatment Plant Project Completed 2024
The Danville Water Department was established in 1892 and continues to serve Danville's water needs to this day. The current water treatment plant was placed into service in 2004 and is located in front of Ellis Park in Danville, IN. Water Treatment Plants are typically designed for a 20-year growth period. We will exceed the 20-year design growth rate by 2024 and are nearing the capacity of the existing plant and wells. The immediate need for the Town is to increase the water supply, treatment, and storage facilities that are nearing capacity so that the Town can continue to provide safe, reliable drinking water to its existing customers and not have to utilize water from another source.

Article by Banning Engineering about the future growth of the Danville Water Treatment Plant.
Danville Drinking Water Improvements storyboard.
Frequently Asked Questions about the New Water Treatment Plant.
New Water Treatment Facility
8/21/2024 Ribbon Cutting Ceremony Held
Press Release

9/2023:
Starting 9/25/2023 Temporary Road Closure at the intersection of Columbia and Sycamore. Road work is estimated to take 10 days. The intersection will be open for thru traffic on the weekend (9/1/2023-10/1/2023) but will close during the week.
7/24/23 East Entrance to Blanton Woods Trail Closure: The east entrance to the Blanton Woods trails will be closed starting on or after 7/24/2023. Please use the Blanton Woods trail entrance off N. Washing St. (894 N. Washington St.).
5/2023:
The sanitary and electric installation has been finished: Green line
Storm drain installation has been completed (Parking lot will be paved toward the end of the project): Yellow line
2023: Construction started on a new water treatment plant.

Water Treatment Facility Rendering

New Water Wells
The Town’s source of raw water supply is derived from four (4) groundwater supply wells within the aquifer along the West Fork White Lick Creek that runs through Ellis Park and Blanton Woods. This project added (2) additional wells. One north of the existing wells (Ellis Park) and one west of the existing wells (Blanton Woods) but within the same aquifer and well field.
New Clearwell Storage Tank
A new Clearwell ground-level water storage tank has been completed at the new water treatment plant site, located on the North side of Ellis Park. The new Clearwell not only provides additional finished water storage but will enable the water treatment plant to be inactive for a period of periodic operational maintenance.

